How to approve the first machined frame front
Inspect the lens groove and the hinge axis on the same first-off part.
Agree the reference, the measurement and the remedy before the run starts.

| Control point | Evidence for the buyer | Decision |
|---|---|---|
| Pre-series | Signed physical master, sample ID, drawing and artwork revisions, colour chip and boundary samples | Release the agreed revision to production |
| In-process | Material lot, critical dimensions, hinge fit, colour and finish against agreed limits | Release the stage or hold for review |
| Final inspection | Sample plan, measured values, observed defects, packaging and assembly test | Release, sort, rework or hold the identified lot |
| Claim resolution | Lot reference, affected quantity, photos, acceptance clause and claimed nonconformity | Record containment, evidence, remedy and closure |
Illustrative document format. Project measurements, limits, sample size and remedies belong to the signed order.
The signed specification defines conformity. The contract sets the notice window, evidence, responsibility, and agreed rework, replacement or other remedy.
Define the part mix, input grade, operator setup, trial duration and number of acceptable parts. Record the same conditions for FAT and SAT.
A processing-cost commitment requires agreed tariffs, yield, loading and volume. Sales, margin and payback scenarios are reviewed with the buyer’s own assumptions.
Inspect the lens groove and the hinge axis on the same first-off part.
Specify the finished lens, the intended market and the report matching the delivered model.
Approve the jaw opening, tooth clearance and spring return against the intended hair volume.